MAJOR SOLAR POWER PROJECTS
Engineering-Driven Energy Investments
We implement your solar energy investments with technical analysis, system optimization, and advanced engineering solutions. We provide technically optimized system solutions that maximize both energy generation efficiency and investment returns.

Thaxted Solar Farm is a renewable energy project located northwest of the town of Thaxted, in the Essex region of the United Kingdom. Developed with the goal of contributing to the country’s clean energy transition, the project received approval from Uttlesford District Council in early 2020 and was successfully completed in 2022.

On behalf of Hayat Sağlık Hizmetleri Yatırım İşletmeleri Turizm Taahhüt Ticaret ve Sanayi Inc., a ground-mounted solar power plant with a capacity of 9.99 MWp / 7.23 MWe was installed on parcels 596/97 and 596/99 in Akalan District, Acıpayam, Denizli Province.

Located in İlyaslı Village, Merkez District of Uşak Province, on parcels 445/5–8, the ground-mounted Kulakboğazı SPP has an installed capacity of 6.03 MWe / 7.13 MWp.
MAJOR SOLAR POWER PROJECTS
Our solar energy projects represent one of the fastest-growing and highest-potential areas of our renewable energy investments. Developed with modern photovoltaic panel technologies and efficient engineering solutions, our solar projects prioritize both sustainable energy generation and environmental benefits.
-
The solar panels used in our projects deliver high performance even under varying climatic conditions and provide reliable energy production for investors due to their long-lasting structures.
-
Our solar investments go beyond clean electricity generation; they contribute to reducing carbon emissions, increasing local employment, and strengthening energy independence. International quality standards are applied throughout project development and EPC processes, ensuring high efficiency and long-term sustainability.
-
Each of our solar projects holds strategic value in its region, enhancing the diversity of our renewable energy portfolio and leading the way in environmentally friendly and innovative solutions within the energy sector.

On behalf of Ferro Ferro Casting Industry and Foreign Trade Inc. the ground-mounted Uzunoluk SPP was established in İlyaslı Village, Merkez District of Uşak Province, across parcels 426/427-2, 3, 10, 11, 13, 20, and 21. The project features a capacity of 9.20 MWe / 9.99 MWp.

On behalf of Tekirova Şahinler Tourism, Construction and Trade Inc., a ground-mounted solar power plant with a capacity of 3.37 kWp / 2.37 MWe was established on parcel 154/163, located in Sandal District, Kula, Manisa Province.

BAŞATLI SPP
On behalf of Başatlı Boru Profil Sanayi ve Ticaret Inc., a rooftop solar power plant with a capacity of 2.10 MWe / 2.50 MWp was installed on the facility located at parcel 856/23, Kullar District, Başiskele, Kocaeli Province.
FOR MORE...

SÜMERPARK SPP
On behalf of Pera Gayrimenkul Yatırım Ortaklığı Inc., a rooftop solar power plant with a capacity of 2.50 MWe / 3.01 MWp was installed on the rooftops of the Sümerpark Shopping Mall and Migros building, located on parcel 6226/1 in Sümer District, Merkezefendi, Denizli Province.
FOR MORE...

On behalf of Türkter Tersane ve Deniz İşletmeciliği A.Ş., a ground-mounted solar power plant with an installed capacity of 2.50 MWe / 3.42 MWp has been established on parcel 18, block 202, located in Dereyaka Neighborhood, Central District of Tokat Province.

ER Grup Şirketi adına Tokat ili, Merkez İlçesi, Dereyaka Mahallesi, 202 ada, 17 parsel ve 166 ada 11 parseller üzerinde toplamda 2,37 MWe/3,18 MWp GES kurulumu yapılmıştır.
PROJE | AC GÜÇ | DC GÜÇ | ROL | YIL |
|---|---|---|---|---|
Ferro GES | 15,90 | 18,04 | Full EPC, Enerji Nakil Hattı | 2024 |
Lila Kozmetik | 1,20 | 1,61 | Full EPC | 2023 |
Sümerpark Çatı GES | 2,60 | 3,20 | Full EPC | 2023 |
Şahin GES | 2,50 | 3,40 | Proje Geliştirme, Full EPC, Enerji Nakil Hattı | 2023 |
Tüzün GES | 7,23 | 9,99 | Proje Geliştirme, Full EPC, Enerji Nakil Hattı | 2023 |
Türkter GES | 2,50 | 3,30 | Proje Geliştirme, Full EPC, Enerji Nakil Hattı | 2022 |
Er GES | 2,37 | 3,14 | Proje Geliştirme, Full EPC, Enerji Nakil Hattı | 2022 |
Başatlı Çatı GES | 2,10 | 2,50 | Proje Geliştirme, Full EPC | 2022 |
Thaxted Solar Farm | 40,00 | 48,00 | Mekanik İşler | 2021 |
Erkar Hybrid GES | 0,300 | 0,356 | Full EPC | 2021 |
Silvan GES | 3,96 | 5,126 | Proje Geliştirme, Full EPC, Enerji Nakil Hattı | 2020 |
Fırıncı GES | 5,94 | 7,26 | Proje Geliştirme, Full EPC, Enerji Nakil Hattı | 2019 |
Hocaahmet GES | 2,97 | 3,525 | Proje Geliştirme, Full EPC, Enerji Nakil Hattı | 2018 |
YDR GES | 0,99 | 1,175 | Proje Geliştirme, Full EPC, Enerji Nakil Hattı | 2017 |
Bitlis GES | 5,94 | 7,05 | Proje Geliştirme, Full EPC, Enerji Nakil Hattı | 2017 |
Hilvan GES | 7,50 | 9,04 | Proje Geliştirme, Full EPC, Enerji Nakil Hattı | 2017 |
CKSU GES | 5,64 | 7,05 | Full EPC, Enerji Nakil Hattı | 2017 |
Hilvan -1 GES | 18 | 21,50 | Proje geliştirme | 2016 |
Kalyon Çatı GES | 0,70 | 0,99 | Full EPC | 2016 |
Darende GES | 7,05 | 5,64 | Proje Geliştirme, Full EPC, Enerji Nakil Hattı | 2015 |
Hasançelebi GES | 5,64 | 6,82 | Proje Geliştirme, Full EPC, Enerji Nakil Hattı | 2016 |
Metimsa GES | 0,94 | 1,17 | Proje Geliştirme, Full EPC, Enerji Nakil Hattı | 2016 |
Yeşilyurt GES | 1,98 | 2,27 | Proje Geliştirme, Full EPC, Enerji Nakil Hattı | 2015 |