ER Yatırım GES-Saha Son Durum Foto.JPG

ER GROUP SPP

ER GROUP SPP

  • On behalf of ER Group , a ground-mounted solar power plant with a total installed capacity of 2.37 MWe / 3.18 MWp has been established on parcel 17, block 202 and parcel 11, block 166, located in Dereyaka Neighborhood, Central District of Tokat Province.

  • The project was delivered to the investor on a turnkey basis, covering all processes including the connection permit application, TEDAŞ project approval, grid connection agreement, and successful completion of the TEDAŞ provisional acceptance procedures.

  • As part of our two-year operation and maintenance agreement, regular site maintenance continues to be carried out, with real-time monitoring of the entire facility ensured through the integrated monitoring system.

YEAR : 2025

ROLE: TURNKEY EPC

POWER: 2,37 /3,18 MWp

er-grup-1
er-grup-2
er-grup-3