MAJOR HYDRO POWER PROJECTS
Engineering-Driven Energy Investments
We implement hydroelectric energy projects with maximum efficiency through technical analysis, hydrological modeling, and advanced engineering solutions.

TEPEHAN HPP
LOCATION:
Pütürge District, Malatya Province
POWER: 17 MW
ROLE: Project Development
YEAR: 2008

AKSU HPP
LOCATION:
Sincik District, Adıyaman Province
POWER: 5,7 MW
ROLE: Project Development, Shareholder
YEAR: 2008

MENGEL HPP
LOCATION:
Pütürge District, Malatya Province
POWER: 14,52 MW
ROLE: Project Development
YEAR: 2009
MAJOR HYDRO POWER PROJECTS
Our projects are designed to adapt to diverse geographical and hydrological conditions, standing out with high energy conversion efficiency and low maintenance costs. Through innovative turbine and generator designs, advanced control systems, and digital monitoring technologies, plant performance is continuously optimized, ensuring uninterrupted energy generation. In this way, both production capacity is increased and maximum energy output is achieved throughout the operational lifespan.
Our R&D activities in the field of hydroelectric energy are carried out with the goal of increasing local production and strengthening technological independence. Through advanced engineering applications such as smart grid integration, energy storage solutions, and data analytics–based monitoring systems, we enhance the efficiency and resilience of renewable energy infrastructure. In this context, hydroelectric energy is established as one of the most reliable and powerful alternatives for a sustainable future.
-
Our projects, developed with high-efficiency turbine technologies and engineering solutions, contribute to energy supply security while prioritizing environmental sustainability.
-
Throughout the project development phases, engineering, financing, and environmental impact management processes are implemented in compliance with international standards, enabling the realization of long-term and reliable investments.
-
Our hydroelectric energy portfolio contributes to the country’s renewable energy targets, while also supporting carbon emission reduction and the diversification of energy sources.
-
The project development processes — including site identification, hydraulic measurements, Environmental Impact Assessment (EIA) reports, technical interaction reports, zoning and project approvals, grid connection agreements, turbine and generator installation, and all technical engineering processes — are carried out entirely by our company.
PROJE | AC GÜÇ | ROL | DC GÜÇ | YIL |
|---|---|---|---|---|
Tepehan HES | 17,00 | Proje Geliştirme | 17,00 | 2008 |
Aksu HES | 5,7 | Proje Geliştirme , Yatırım Ortaklığı | 5,7 | 2008 |
Mengel HES | 14,52 | Proje Geliştirme | 14,52 | 2009 |
Yakacık HES | 11,42 | Proje Geliştirme | 11,42 | 2009 |
Hisar HES | 6,20 | Proje Geliştirme | 6,20 | 2009 |