MAJOR HYDRO POWER PROJECTS

Engineering-Driven Energy Investments

We implement hydroelectric energy projects with maximum efficiency through technical analysis, hydrological modeling, and advanced engineering solutions.

Image by Dan Meyers

TEPEHAN HPP

LOCATION:

Pütürge District, Malatya Province

POWER: 17 MW 

ROLE: Project Development

YEAR: 2008

Image by Jason Nguyen

AKSU HPP

LOCATION:

Sincik District, Adıyaman Province

POWER: 5,7 MW 

ROLE: Project Development, Shareholder

YEAR: 2008

Image by Timon Reinhard

MENGEL HPP

LOCATION:

Pütürge District, Malatya Province

POWER: 14,52 MW 

ROLE: Project Development

YEAR: 2009

MAJOR HYDRO POWER PROJECTS

Our projects are designed to adapt to diverse geographical and hydrological conditions, standing out with high energy conversion efficiency and low maintenance costs. Through innovative turbine and generator designs, advanced control systems, and digital monitoring technologies, plant performance is continuously optimized, ensuring uninterrupted energy generation. In this way, both production capacity is increased and maximum energy output is achieved throughout the operational lifespan.

Our R&D activities in the field of hydroelectric energy are carried out with the goal of increasing local production and strengthening technological independence. Through advanced engineering applications such as smart grid integration, energy storage solutions, and data analytics–based monitoring systems, we enhance the efficiency and resilience of renewable energy infrastructure. In this context, hydroelectric energy is established as one of the most reliable and powerful alternatives for a sustainable future.

  • Our projects, developed with high-efficiency turbine technologies and engineering solutions, contribute to energy supply security while prioritizing environmental sustainability.

  • Throughout the project development phases, engineering, financing, and environmental impact management processes are implemented in compliance with international standards, enabling the realization of long-term and reliable investments.

  • Our hydroelectric energy portfolio contributes to the country’s renewable energy targets, while also supporting carbon emission reduction and the diversification of energy sources.

  • The project development processes — including site identification, hydraulic measurements, Environmental Impact Assessment (EIA) reports, technical interaction reports, zoning and project approvals, grid connection agreements, turbine and generator installation, and all technical engineering processes — are carried out entirely by our company.

PROJE
AC GÜÇ
ROL
DC GÜÇ
YIL
Tepehan HES

17,00

Proje Geliştirme

17,00

2008
Aksu HES

5,7

Proje Geliştirme , Yatırım Ortaklığı

5,7

2008
Mengel HES

14,52

Proje Geliştirme

14,52

2009
Yakacık HES

11,42

Proje Geliştirme

11,42

2009
Hisar HES

6,20

Proje Geliştirme

6,20

2009

Contact us for more information.